Project:Medicine Hat Waste Water Treatment Plant
Location:Medicine Hat, AB
Completed:Dec 2008

The Medicine Hat Waste Water Treatment UV Expansion Project was an aggressive 10 month construction schedule. This project  included demolishing the existing concrete effluent chamber and converting this space into a multi level UV Chamber constructed of concrete and structural steel. A new concrete block building was constructed to house the new UV Facility.  

Two new UV Banks were installed along with variety of verticle turbine and process pumps, wood stave alum tanks, compressors, weir gates, slide gates, new clarifier covers and process piping.   

 A large hydro-excavated trench was cut to accept the new fire line upgrade and piping installation, with two 48" carbon steel effluent pipe mains cored through an existing concrete wall and hoisted into the new building.

The Pipefitting and civil was completed own forces on this project.



Industrial